Oncology hospital · Wrocław
Ventilation installations for a new oncology hospital: ductwork with insulation and balancing, installed inside the main contractor’s live programme without holding up the other trades.
We design, build and service installations that withstand years of continuous operation. Production halls, industrial plants, public buildings. Meet APEX Support.
Four disciplines that overlap in practice: design without hands-on installation stays theory, and service without knowing the design is guesswork. We run them together, from the first site measurement to an inspection long after handover.
Ventilation, water and sewage, heating, gas, boiler rooms and heat pumps. Detailed design, installation and commissioning.
Steam systems, compressed air, process media, process cooling. Welded pipework.
Detailed design, technical consulting, energy audits.
Scheduled inspections, fault clearance, out-of-hours cover. Response time is agreed to match your production profile, typically within six hours of the call. Your plant keeps running.
Ventilation installations for a new oncology hospital: ductwork with insulation and balancing, installed inside the main contractor’s live programme without holding up the other trades.
Ongoing care of a set of condensing units cooling the air handling plant of the production halls. Inspections, diagnostics, controls and compressor maintenance. The site moved from breakdown call-outs to planned maintenance.
Design and modernisation of ventilation in a plant that stayed in production throughout. A new 17,000 m³/h air handling unit with ductwork for the kitchen and canteen, plus a 50,000 m³/h unit for the laminate store. Chilled-water cooling, heating from the plant steam system.
Design and installation of ventilation for battery cell testing rooms. Rectangular ductwork and fabric ducts with laminar discharge, together with modernisation of the existing air handling units.
A predictable process matters as much as the quality of the material. Every stage has its schedule, its named owner and its documentation.
Site visit, measurements, survey of existing condition. Technical brief within 5 days.
Detailed design and a line-by-line cost estimate. No hidden items.
Our own crews and proven partners. On-site coordination, health and safety, documentation.
Commissioning, as-built documentation, training, 24/7 service contract.
APEX Support was established in Wrocław in 2023. The company is built around practitioners with years of experience in sanitary and industrial installations, each in their own specialisation.
The core of the team is fitters and service technicians holding the relevant certifications, backed by engineers, a site manager and a designer. We take on everything from small modernisations to complete process systems in production halls.
Every project is run by one manager, from brief to final handover.
We reply within 24 business hours. Tell us what you need built, or what has stopped working. We will come back with questions, or straight away with a date for a site visit.